Estimate concrete for continuous (strip) footings under walls. Enter the total length of all runs, then the width and depth.

How it’s calculated

Volume = total length × width × depth, plus waste. For a rectangular building, the total length is roughly the perimeter. Measure along the centreline of the footing so the corners aren’t counted twice.

Worked example

With these inputs:

Total footing length
60 ft
Width
16 in
Depth
8 in
Supply as
Pre-mixed bags
Bag size
80 lb
Waste allowance
10%

the result is:

Concrete needed
2.17 cu yd
Net volume
1.98 cu yd
Plan area
80 sq ft
Ready-mix order (to ¼ yd)
2.25 cu yd
80 lb bag
98 bags

Tips from the trade

  • Dug trenches are rarely neat. Allow 10–15% waste, or more in sandy soil where the sides slump.
  • Footing size depends on the load and the soil. The IRC tables give minimums, but follow your plans.
  • Order ready-mix with a little spare. Running short on a footing pour leaves a cold joint.

Common questions

How do I measure a footing perimeter?

Add the centreline lengths of every wall run. For a simple rectangle, that is 2 × (length + width) minus 4 × the footing width.

Results are estimates for planning and pricing. Check quantities against your drawings, the manufacturer’s data and local building codes before ordering.