TakeoffYard
Home/Concrete & Masonry/Strip Footing Calculator

Strip Footing Calculator

Continuous footings and foundation trenches. Metric units, change any unit beside its field.

Measurements

Add up every run of footing.
%
Extra for cuts, breakage and spillage.

About this calculator

Estimate concrete for strip foundations and trench-fill footings. Enter the total length of all runs, then the width and depth.

How it’s calculated

Volume = total length × width × depth, plus waste. For a rectangular building, the total length is roughly the perimeter. Measure along the centreline of the footing so the corners aren’t counted twice.

Worked example

With these inputs:

Total footing length
18 m
Width
600 mm
Depth
225 mm
Supply as
Pre-mixed bags
Bag size
20 kg
Waste allowance
10%

the result is:

Concrete needed
2.67 m³
Net volume
2.43 m³
Plan area
10.8 m²
Premix order (to 0.2 m³)
2.8 m³
20 kg bag
282 bags

Tips from the trade

  • Dug trenches are rarely neat. Allow 10–15% waste, or more in sandy soil where the sides slump.
  • In Australia, footing sizes come from AS 2870 for your site classification (A, S, M, H1, H2, E or P) or from the engineer. Use the real trench depth, not the drawn minimum.
  • Order ready-mix with a little spare. Running short on a footing pour leaves a cold joint.

Common questions

How do I measure a footing perimeter?

Add the centreline lengths of every wall run. For a simple rectangle, that is 2 × (length + width) minus 4 × the footing width.

Results are estimates for planning and pricing. Check quantities against your drawings, the manufacturer’s data and the NCC and Australian Standards before ordering.