TakeoffYard
Home/Concrete & Masonry/Fence Post Concrete Calculator

Fence Post Concrete Calculator

Bags per post hole, with gravel base. Metric units, change any unit beside its field.

Measurements

Actual width, e.g. 90 mm, 100 mm or 125 mm.
%
Extra for cuts, breakage and spillage.

About this calculator

How many bags of rapid-set concrete or concrete mix you need to set fence posts, mailbox posts or pergola legs. The post’s own volume is subtracted.

How it’s calculated

Concrete per hole = (hole area − post area) × (hole depth − gravel depth). Multiply by the number of posts, add waste, and divide by the bag yield.

Worked example

With these inputs:

Number of posts
10
Hole diameter
300 mm
Hole depth
600 mm
Post shape
Square
Post size
100 mm
Gravel at base
100 mm
Product
Rapid-set concrete 20 kg
Waste allowance
10%

the result is:

Bags needed
36 bags
Concrete per hole
30 L
Total concrete
0.33 m³
Gravel for bases
71 L

Tips from the trade

  • Hole diameter is usually about three times the post width.
  • Bury about one third of the post’s total length, and go deeper on exposed or windy sites.
  • Gravel in the bottom of the hole lets water drain away from the post end.
  • Slope the top of the concrete away from the post so water runs off.

Common questions

How many bags per fence post?

A 100 mm post in a 300 mm × 600 mm hole, with 100 mm of gravel in the bottom, takes three to four 20 kg bags of rapid-set concrete.

Results are estimates for planning and pricing. Check quantities against your drawings, the manufacturer’s data and the NCC and Australian Standards before ordering.